Xcalibre Equipment Ltd was involved in the construction of the new airport, we supplied hydraulically powered diamond drilling equipment which was used to test the integrity of the newly laid runways.
The drills take a sample core which can then be analysed by experts to ensure it meets specific standards.
Runway, taxiway and apron core sampling is an increasingly important part of running a professional Airport.